Phase 2 - Coordination Explorer

Drag the assumptions and watch the coordination dividend move, live. Each of the 0 multi-agency buildings has its visits regenerated and packed into worker-shifts in your browser (First-Fit-Decreasing bin packing - a fast, near-optimal stand-in for the exact OR-Tools CP-SAT engine in the static report). Inputs: PSW org counts and service hours per building; everything below is a planning assumption.

Assumptions

Worker commitment trades the two objectives: more days/week dedicated to a building means the same faces return (continuity ↑) but more of each worker's week sits reserved for it (flexibility ↓, shown as dedicated-capacity utilization).
Worker-shifts/day (siloed → coordinated)
Fewer workers entering buildings
Coordination dividend / year
Distinct workers/week per building (continuity)
Dedicated-capacity utilization

Where coordination frees up the most workers

Siloed (per-agency) Coordinated (pooled)
Each pair of bars is one building (top 12 by workers saved): red = workers dispatched today, teal = workers needed if the building's visits were pooled. Numbers reflect the live assumptions above.